|
Below you’ll find links to the Interactive SEMICON West 2008 Floor Plan and PDF floor plans of the SEMICON West 2008 exhibit halls:
Interactive SEMICON West 2008 Floor Plan
Interactive SEMICON West 2008 Floor Plan
Downloadable/Printable PDF Floor Plans
North Hall (526 KB)
South Hall (629 KB)
West Hall – Level 1 (414 KB)
West Hall – Level 2 (493 KB)
Targeted Move-in Schedule
In order to maximize the efficiency of the freight move-in process at SEMICON West, each booth is designated an optimal move-in or ‘targeted’ freight move-in time. To assist in your pre-show planning, please find below the targeted floorplans for your reference. Exhibitors shipping directly to Moscone Center should ensure that freight does not arrive before your targeted move-in date and time indicated in the color coded plans.
If you have questions regarding your targeted move-in date and time, please contact Leslie Schade at SEMI, email lschade@semi.org / tel. 1.408.943.6978. If you have any concerns regarding your targeted move-in date and time, please contact Bobby Stout at Freeman, email: bobby.stout@freemanco.com / tel: 1.214.445.1198.
|